Space-Frame Roofing, Tel HaShomer Hospital
Ramat Gan
1,200 m²
Full design and construction of a roofing system on a space-frame structure at the Tel HaShomer hospital campus, about 1,200 m². Roof Dagan delivered the project design-build: engineering design, importing the system's assemblies from abroad, and assembling and installing the space frame on site — for a strong, durable envelope that stays watertight for years. Structural engineer: Shai Furman; main contractor: Rom Gevas.
Architectural design: Dan Liberman
Structural design ✓