Wingate Olympic Pool
Wingate Institute
Fixed enclosures
600 m²
Span 32 m
Design and installation of cladding for the Wingate Institute Olympic pool enclosure, about 600 m². The cladding follows a diagonal geometry with panels in several shades, giving the building a modern, dynamic look. The panels, made by Palram Israel, resist UV radiation, humidity and chemicals. Roof Dagan carried out the engineering design, fitting and on-site installation.
Build duration: 3 months
Warranty: 3 years
Architectural design: Roof Dagan (in-house design)
Structural design ✓