Wingate Olympic Pool
Wingate Institute
Motorized enclosures
Year built 2000
2,000 m²
Span 32 m
A pool enclosure on a motorized traveling framework running on channels, clad with blue Polygal panels.
Build duration: 3 months
Warranty: 3 years
Architectural design: Roof Dagan (in-house design)
Structural design ✓