Wingate Olympic Pool

Wingate Institute
Motorized enclosures
Year built 2000
2,000 m²
Span 32 m
Talk to us

A pool enclosure on a motorized traveling framework running on channels, clad with blue Polygal panels.

Build duration: 3 months

Warranty: 3 years

Architectural design: Roof Dagan (in-house design)

Structural design