Tel Aviv Training Pool
Tel Aviv
Motorized enclosures
Year built 2021
1,400 m²
Span 27 m
Restoration of the steel framework, including sanding and repainting. Roofing replaced with 18 mm Sunpal ML panels by Palram. Overhaul of the enclosure's drive systems.
Build duration: 1 month
Structural design ✓