Taylor House Jerusalem

Jerusalem
Fixed enclosures
Year built 2006
700 m²
Span 26 m
Talk to us

Design and execution of the framework's renovation after its collapse in the last snowstorm: clearing all debris, fabricating and supplying a complementary framework, reinforcing the whole structure, re-cladding the entire roof with 10 mm double-walled Polygal panels, and closing the sides with roll-up canvas sheets.

Build duration: 3 months

Warranty: 3 years

Architectural design: Roof Dagan (in-house design)

Structural design