Talpiot Mizrah, Jerusalem
Jerusalem
Motorized enclosures
900 m²
Span 24 m
Galvanized, oven-painted steel framework. Roof clad with 18 mm double-walled solar-grey polycarbonate; walls clad with 10 mm double-walled polycarbonate. A drive system for the two roof sections and a locking system preventing wind-suction lift.
Build duration: 4 months
Architectural design: Nachman Etstein
Structural design ✓