Sohim VeNehenim Swimming Pool
Rishon LeZion
Motorized enclosures
Year built 2002
1,500 m²
Span 32 m
Dismantling of the old framework and design and construction of a new one, including a traveling roof window of about 200 m². Roof clad with 16 mm Polygal panels.
Build duration: 5 months
Warranty: 3 years
Architectural design: Roof Dagan (in-house design)
Structural design ✓