Ramat Aviv Gimel Pool Enclosure

Tel Aviv
Motorized enclosures
3,000 m²
Span 28 m
Talk to us

Renovation of a motorized fan roof: removal of the old panels, reinforcement and repainting of the framework, and installation of two-tone 18 mm double-walled Palram panels — white inside, metallic grey outside. Overhaul of the drive and control systems, including a motor replacement.

Build duration: 1 month

The schedule was short and tight, and despite additions during the work — Yossi managed to shorten the timeline. The work was carried out at great height under the strictest safety rules, by a skilled, professional team. There are not enough warm words to describe Yossi Dagan. Warmly recommended.

Gil Nadel · Yuval Nadel Projects Ltd.