Neve Sharet Pool Enclosure
Tel Aviv
Fixed enclosures
600 m²
Dismantling and replacement of the pool enclosure: removal of the old timber framework, foundations and anchoring for the new roof, and erection of a new steel enclosure with electrical, lighting, ventilation, glazing, and aluminum systems — plus a new building frame for an adjoining spa and jacuzzi complex. Covered with 16 mm double-walled polycarbonate panels.
Build duration: 3 months
Structural design ✓