Hutzot Ashkelon Mall
Ashkelon
Fixed enclosures
Year built 2008
800 m²
Span 22 m
Replacement of all the panels over the mall's central patio with 16 mm Primalite polycarbonate — according to the client, the Primalite panels significantly reduced the mall's air-conditioning costs.
Build duration: 2 months
Warranty: 3 years