Holmes Place Givat Shmuel Pool

Givat Shmuel
Motorized enclosures
700 m²
Span 25 m
Talk to us

Full design-build of the enclosure and steel structure for the Holmes Place Givat Shmuel pool, about 700 m²: structural design, steel fabrication, systems development and on-site erection. The enclosure is designed for its loads, with thermal and acoustic insulation and full waterproofing, and blends into the building with a clean, elegant look. Delivered with main contractor Shapir Engineering.

Build duration: 3 months

Warranty: 3 years

Architectural design: Galpaz Architects

Structural design ✓

“Our company built a swimming-pool enclosure with Roof Dagan at the Holmes Place sports center in Givat Shmuel. The company carried out its work professionally, kept closely to the schedule, and matched the client's needs.”

Ehud Deri · Shafir Engineering, Initiation & Industries