Givat Haim Hydrotherapy Pool

Givat Haim
Fixed enclosures
Year built 2005
700 m²
Span 24 m
Talk to us

Design and construction of a hydrotherapy pool enclosure including framework, foundations, Polygal panel cladding, a motorized roof window, and perimeter closure with reinforced Klil 7000 aluminum frames.

Build duration: 3 months

Warranty: 3 years

Architectural design: Roof Dagan (in-house design)