Givat Haim Hydrotherapy Pool
Givat Haim
Fixed enclosures
Year built 2005
700 m²
Span 24 m
Design and construction of a hydrotherapy pool enclosure including framework, foundations, Polygal panel cladding, a motorized roof window, and perimeter closure with reinforced Klil 7000 aluminum frames.
Build duration: 3 months
Warranty: 3 years
Architectural design: Roof Dagan (in-house design)