Diamond Tower Pool Enclosure

Ramat Gan
Fixed enclosures
800 m²
Span 20 m
Talk to us

Design and construction of a motorized traveling roof frame. Load engineering for 6+10 mm glass glazing. The roof is divided into 8 units, allowing up to 75% opening.

Build duration: 3 months

Structural design