Crowne Plaza Jerusalem
Jerusalem
Motorized enclosures
Year built 2004
800 m²
Span 24 m
Design and construction of a pool enclosure carried on concrete columns about thirty meters high, with Klil 9000 aluminum vitrines between them. A concrete channel atop the columns houses the entire drive system. The roof is built of three segments, two of which converge to open the pool to the sky when needed; the motorized roof is operated by the lifeguard or any trained operator.
Build duration: 6 months
Warranty: 1 year
Architectural design: Roof Dagan (in-house design)
Structural design ✓