Kfar Saba Country Club Pool
Kfar Saba
Motorized enclosures
Year built 2010
850 m²
Span 26 m
Full enclosure replacement: dismantling of the old roof, fabrication of a new framework, installation of 16 mm Polygal panels, a motorized roof window, and perimeter glazing with 11 mm glass.
Build duration: 5 months
Warranty: 3 years
Architectural design: Roof Dagan (in-house design)
Structural design ✓