Country Club Goren Goldstein
Tel Aviv
Fixed enclosures
Year built 2003
600 m²
Span 22 m
Removal of the old panels from the building's timber framework; supply and installation of new 10 mm Polygal panels with 18% light transmission, using aluminum base connectors and polycarbonate caps.
Build duration: 3 months
Warranty: 1 year