Ganei Aviv Country Club, Lod
Lod
Motorized enclosures
800 m²
Span 32 m
Design and construction of a motorized traveling roof, split by a main girder along the pool. Roofing with 18 mm Sunpal panels by Palram; maximum roof opening of 37.5%.
Build duration: 4 months
Architectural design: Galpaz Architects
Structural design ✓