Beit Mazia, Jerusalem

Jerusalem
Fixed enclosures
Year built 2009
450 m²
Span 18 m
Talk to us

Design and construction of a thermo-acoustic roof: a galvanized, oven-painted framework clad with perforated cassettes, rock wool, fire-treated timber boards, and standing-seam copper sheeting.

Build duration: 4 months

Warranty: 1 year

Architectural design: Roof Dagan (in-house design)

Structural design