MD Mandelboim Plant & Logistics Center
Management of the design and engineering coordination for the industrial building and logistics center of MD Mandelboim, the mattress maker, about 10,000 m². Roof Dagan, led by Yossi Dagan, carried the project from the initial site development and groundworks, through the structure and building systems, to the occupancy permit (Form 4): leading the design and coordinating the consultants and architects, selecting an executing contractor from Portugal — FE3+ — and running it to international standards, and managing a rigorous testing program to meet every engineering and safety regulation and requirement. The plant moved from Kibbutz Zikim, including dismantling the machinery in the old building and reinstalling it on the new site, and assuring product quality took many coordination and inspection trips abroad.
Architectural design: Israel Elias