Office & Retail Building, Holon
Holon
Roof Dagan manages and supervises the construction of an office and retail building in Holon, developed by Carvil. The project is in advanced design: the building will have 4 underground floors for parking and logistics and 7 office and retail floors above ground. From the design stage on, Roof Dagan provides engineering control and coordinates the design consultants, the structural engineers, and the main contractor ahead of breaking ground. Structural design: Schiller Oren Engineering; main contractor: A.D.R.G. Pictured: renderings of the building.