HFD Group Logistics Center

Mevo Carmel Industrial Park
4,000 m²
Talk to us

Design, management, and construction of the HFD Group's logistics center and industrial building, about 4,000 m², planned and built for the group's advanced shipping and storage needs. The project comprised a steel building and engineering infrastructure fitted for large-scale shipping and storage, with close engineering supervision and ongoing progress tracking with the executing contractor through to the occupancy permit. Delivered with structural engineer Rafi Anunu and executing contractor A.D.R.G.

Architectural design: Giorah Levy